 Business Managements Skills. o Integration Management. o Scope Management. o Time Management. o Cost Management. o Quality Management. o Human Resource Management o Communication Management. o Risk Management. o Procurement Management. o Technical skills. (Engineering)  Career Experience. o Business Development Director. o Sales and Marketing Manager. o Senior Estimator (EPCM) o Senior Estimator Projects (Sub-Sahara Africa). (PCM) o Senior Project Manager o Factory Manager piping. o Production Manager piping. o Factory Manager Veneer Plant. o Superintendent Saw mill.  Industry Experience. o Bio Fuels plants. o Detergents plants. o Sulphuric Acid plants. o Bulk Water Supply. o Industrial Filtration & Agitation. o Mining projects. o Complete Fluid Conveyance Solutions. o Piping Rehabilitation. o Bulk Material Handling. o Mineral Processing Plants.

Personal Details

Name
Jan Van Der Merwe
Gender
Male
Age
44 Years

Job Details

Employment Status
Full time or Part time or Contract / Freelance
Type of Salary
Fixed salary
Preferred Job Location
Anywhere in  Australia

Educational Qualifications

Highest Qualification
Diploma  (Production Engineering)

Professional Details

Professional Experience
9 Years
Languages known
English  (Intermediate)
Additional Information
ESTIMATING EXPERIENCE BASED IN AUSTRALIA (EPCM)
 Letlhakane Heap Leach Project, Botswana (2015) – US$?M

o Definitive Feasibility Study
o Primary & Secondary crushing, Screening & Stacking – 2.0Mtpa
o Heap leach pad, underdrainage and collection ponds
o Infrastructure and 150 bed camp
o EPCM

 Banfora Heap Leach Project, Burkina Faso (2014) – US$101M

o Definitive Feasibility Study
o Primary & Secondary crushing, Screening & Stacking – 2.0Mtpa
o Heap leach pad, underdrainage and collection ponds
o Modular (space frame) A.D.R. plant and Goldroom
o Reagents and Services
o Infrastructure and 150 bed camp
o EPCM

 Carrapateena Copper Project – Autoclave Concentrator, South Australia (2014) AUD$436M

o Preliminary Feasibility Study completed as part of the AECOM Feasibility Study
o Alignment of CCE template and commodities with Expert Estimator for upload
o Demineralization, Steam generation and Oxygen plant
o 180m3/hr Autoclave – Nonox with pretreatment facility
o Tailing neutralization facility
o Concentrate handling
o Expansion of Reagents and Services
o Process, Engineering and Drafting

 Carrapateena Copper Project – Process Plant, South Australia (2014) – AUD$849M

o Preliminary Feasibility Study completed as part of the AECOM Feasibility Study
o Alignment of CCE template and commodities with Expert Estimator for upload
o 10 - 15Mtpa Copper Process Plant – SABC Milling, Flotation and Concentration
o Tailing handling and storage facility
o Concentrate handling and storage
o Reagents and Services
o Process, Engineering and Drafting

 Jervios Gold Project, North Australia (2013)-(2014) – AUD$150M

o Preliminary Feasibility Study with options
o Primary crushing, Stockpiling & Reclaim – 2.0Mtpa
o Single stage SAG Mill facility with Classification –2.0Mtpa
o CIL, Refining and Smelting –2.0Mtpa
o Infrastructure and 150 bed camp
o EPCM

 Mina De Cobre Panama Project, Panama (2013) – US$6,425M

o Preliminary Feasibility Study / Project Budget
o Major bulk earthworks and road infrastructure
o In pit mobile crushing and overland conveying
o 74Mtpa Copper Process Plant - Milling, Flotation and Concentration
o Tailing pumping and Management Facility. Sands Cyclone Facility
o At port Concentrate filtration and storage
o Reagents and services
o Port facility including Concentrate handling, Fuel offloading and customs
o Breakwater and jetty
o 2,500 bed accommodation facilities
o 300 MW PowerStation, Coal handling facility, Powerlines and distribution
o Mining Infrastructure
o Process, Engineering and Drafting (joint contract awarded)

 Kansanshi S3 Sulphide Expansion Project, Zambia (2012) – US$561M

o Preliminary Feasibility Study / Project Budget
o Milling – 25Mtpa throughput
o Rougher, Scavenger, Cleaner Flotation
o Concentrate Product Filtration and Stockpiling
o Infrastructure Upgrade
o Process, Engineering and Drafting (joint contract awarded)

 Banfora Gold Project, Burkina Faso (2012) – US$240M / US$230M

o Definitive Feasibility Study with options
o Primary crushing, Stockpiling & Reclaim – 4.0Mtpa
o Single stage SAG Mill facility with Classification – 4.0Mtpa / 2.0Mtpa
o CIL, Refining and Smelting – 4.0Mtpa / 2.0Mtpa
o Infrastructure and 150 bed camp
o EPCM

 Merlin Moly/Rhenium Project – Roaster, Central Queensland (2012) – AU$152M

o Preliminary Feasibility Study
o Molybdenum Roaster - 6,800tpa
o Rhenium recovery process from Roaster off gas
o Sulphuric acid recovery process from Roaster off gas
o Product Filtration and Bagging
o Joint EPCM with Electrical Contractor

 Merlin Moly/Rhenium Project – Concentrator, Central Queensland (2012) – AU$78M

o Definitive Feasibility Study
o Fine ore feed and Milling 0.5Mtpa throughput
o Rougher, Scavenger, Cleaner Flotation with Regrind
o Concentrate Product Filtration and Bagging plant
o Infrastructure expansion
o Joint EPCM with Electrical Contractor

 Sunrise Dam Water Treatment pond piping and earthworks DFS Western Australia
 Cameron Gold Project PFS Canada
 Guelb Rerouting of fire water line DFS
 Colluli Potash Sea Water Pipeline DFS Eritrea East Africa
 North Parks Rose Dale Tailings Facility PFS NSW Australia
 Masbate Tailings Facility Pipeline Study PFS Philippines
 Freda River Surface Water Management PFS Papua New Guinea

CONTRACT ESTIMATING, PROJECT PLANNING and SCHEDULING EXPERIENCE BASED IN SOUTH AFRICA (PCM)

 Ghana, Obausi Gold Mine (Anglo Gold Ashanti)) (R110 Million)

o Rehabilitation of a 45 km pipe line between the Anglo Gold Obausi plant and the Oda River pump station. Pipe to be re-lined with HDPE liner.
o Turnkey pipe line supply and installation project from the TTP-TSP plants total of 9000 meters, Poly Steel Lined pipe. (HDPE Lined)
o Turnkey pipe line supply and installation project from the STP-TTP plants total of 7000 meters.
o Turnkey pipe line supply and installation project from the Return water dam to TTP return water 2200 meters.

 DRC Congo Tenke Copper Mine (Freeport McMoRan) (R220 Million)

o Turnkey Piping supply and Installation of the Process plant piping, water supply and storm water services.

 Mali Sadiola Mine (Anglo Gold Ashanti) (R20 Million)

o Double Containment Piping Supply and Installation for the new Sulphuric Acid chemical plant.

 Zambia (Vedanta KCM) (R170 Million)

o Turnkey pipe line supply and installation project from the Nchanga Copper Processing plant to the Muntimpa pump station total of 12000 meters, Poly Steel Lined pipe. (HDPE Lined)
o Turnkey pipe line supply and installation project from the Nchanga Copper Processing plant to the TD3 (Tailings dam) pump station total of 18000 meters, Poly Steel Lined pipe. (HDPE Lined) and 5000 meters of HDPE pipe.
o Turnkey pipe line supply and installation project from the Koncola Copper Processing plant to the TD2 (Tailings dam) pump station total of 8000 meters, Poly Steel Lined pipe. (HDPE Lined)
o TLP 4 project, (Tailings Leach and processing plants) upgrade of pumps and station concrete, structures and piping.
o CRF-1 (Copper Refinery Furnace) Nchanga Smelter. Installation of furnace including civils, structures piping, furnace supplied by Autotech.
o Turnkey East Mill Conveyor design, supply and install, earthworks concrete structural and mechanical, total length 1200 meters 367m3/h
o Turnkey Civil construction of new Concentrator at Nchanga Copper Mine.

 Botswana Jwaneng/Orapa Diamond Mines, (R45 Million)

o Upgrade of the tank farms and laboratories, new tanks concrete structural, mechanical and piping project
o Upgrade of water supply, storm water and water drains in plants.

 Namibia Valencia Mine (R80 Million)

o Bulk water supply and temporary water supply line between Swakopmunt and the new development site of Valencia Mining Group, planning to mine Uranium.

 Angola (R170 Million)

o Feasibility study for the Kwanda Base water treatment development project.

 South Africa (R320 Million)

o Anglo Gold Ashanti, Kopanang Mine, Piping project.
o Anglo Gold Ashanti, West Wits Mine, Piping project.
o Aqua Engineering, Water Treatment plant, Komati Power station, supply and install piping.
o Artane projects, Turnkey piping project.
o Crown Mine, Crown to Ergo slurry poly Steel pipe line to new TSF include pump stations, transfer stations and booster pump station 45000 meters Poly steel lined, pipe..
o CTP Kimberly Diamond Processing Plant upgrade, of HDPE piping and upgrade of all the spry bars and Scrubbers structures.
o First Uranium Esulwini, Upgrade of Tank farm and plant piping.
o Gold Fields, upgrade of several processing plant piping and structure
o Harmony ST Helena 20,000 meter slurry line piping project (TSF).

 Impala Platinum Springs Refinery, completed several projects.

o Hydrogen reduction project.
o Iron Grain Leach Pilot Plant project.
o Palladium Optimization project.
o Impala Copper Winnings upgrade Project.
o Impala Demister Flush project.
o Impala Filter Press project.
o Impala Flush water supply line project.
o Impala Chiller water supply project.

 Western Platinum Refinery (Lonmin), complete several projects.
o Upgrade of the OPM main draught line to re-actors.
o Upgrade of the 1.5 diameter draught line from main cyclone area.
o Upgrade of the RDD main draught line to re-actors.
o Lonmin plant storm water upgrade project.

 Xstrata Steelpoort, Thorn Cliff Mine and Magareng Mine.

o Estimated and complete several piping projects, and conveyor systems.
  • Statistics for this Jobseeker's Posting

    Gigajob-ID
    155,188,944
    Posted
    > 99 days ago
    Short-Link
    https://en-au.gigajob.com/155188944.html
    Seen in Search Results
    This ad was matched 59 time(s) in Gigajob search results
    Page Viewed
    This ad was viewed 30 time(s) by Gigajob users